4650 N. Hamilton joins the portfolio
The 1908 four-flat with its 1894 coach house in Lincoln Square closed in November 2026, two doors from 4636–38 N. Hamilton, which Petir renovated in 2025. Same block, same plan: full renovation, then hold.
Notes
Short dated notes on the buildings: what was bought, what was permitted, what was finished and re-let. Newest first. The same notes are posted to Petir's Facebook and Instagram.
The 1908 four-flat with its 1894 coach house in Lincoln Square closed in November 2026, two doors from 4636–38 N. Hamilton, which Petir renovated in 2025. Same block, same plan: full renovation, then hold.
The seven-unit corner building in Bucktown finished its cycle in October 2026: bought in 2024, renovated through 2025, fully re-let, and now refinanced on a long-term loan against the finished building. Buy, renovate, hold, refinance. It stays in the portfolio.
An 1891 five-unit on a corner lot in North Center, bought in October 2026. The plan: redevelop it into seven completely renovated rental units, held long term.
The new house in Logan Square is framed: walls up, rough mechanicals going in, the long run of the main floor already readable from the front door. Built with Nexus Construction; four bedrooms, three and a half baths and an office when it is done.
A 1923 brick five-unit in Irving Park with five outdoor parking spaces, bought off-market in October 2026. The plan: update the apartments, bring rents to market and hold it.
A 1908 brick four-flat with an 1894 coach house and a two-car garage on a corner lot in Lincoln Square, a few doors from a building Petir already renovated on the same street. Closing this autumn; the plan is a full renovation of every apartment and the coach house, then a long hold.
The six-cottage resort on Paw Paw Lake in Coloma, Michigan, bought in 2022 and rebuilt cottage by cottage, is on the market. It has run as a short-stay property since the renovation; the listing is with a commercial brokerage in Southwest Michigan.
Drawings are out for the new house in Logan Square, a four-bedroom, three-and-a-half-bath single-family with an office, built in partnership with Nexus Construction on the lot where an unfinished house was taken down. It will come to market on completion.
Outside work first at the Irving Park three-unit: the rear porches were rebuilt in new lumber, a cedar fence now runs the side and rear of the lot, and the interior has been taken down to the studs ahead of the new kitchens. The siding and windows are next.
The three-unit building in Irving Park bought last year is in full renovation this year: new kitchens in every apartment, baths rebuilt, and the systems brought up to date before the units are re-let.
The city approved the permit set for the three-storey brick building on the Damen corridor in Ukrainian Village. The ground-floor storefront converts to a live/work unit and the five apartments above are fully renovated, with the masonry restored as part of the same job.
The seven-unit corner building in Bucktown, bought in 2024, was renovated through 2025 and is fully re-let. It is held, not sold, like every building Petir finishes.
Six units in West Town, including two coach-house apartments, taken down to the structure and rebuilt in a single phase. Bought in 2024, finished and leased in 2025.
A six-flat in Humboldt Park acquired in 2025. Rather than empty the building, the apartments are being updated one at a time as tenancies turn, so the building keeps earning while it is brought up to Petir's standard.
Projects
The listing photo from the day each building was bought, beside the same building once it was rebuilt.
See the projects